22.9.11. Working in two parties, one on the slipway portal, and clearing out the joints in the concrete slabs and injecting a sealant between them. The other backfilling the piles to the west of the slip, and trying to remove the tree stump between the slip and the small brick shed that houses the pump out.





No comments:

Post a Comment