21.9.11. 6 of us there, working on back filling behind the west side of the slip, close to the diesel tank. And on the seating for the gate at the lower end of the slip. John is to make the calculations for the gate, which can be made at any time. It can then be dropped into place if needed, provided we prepare the seal locations before flooding the slip.

No comments:

Post a Comment