16.3.12. As with all the other daily pictures they should be viewed from the bottom to the top, the top being the last photograph taken that day.
This day's work was pouring and trying to control the flow of concrete. Done ably as on previous occasions by the concrete team led by Colin. There is more concreting to be done this side of the slip and along the water's edge to the first moorings. Then,  of course, on the other side too. First step of that was getting some previously used timber over there for Ashley to make up the shuttering.
This was also the final day of welding on the slip. Fitting that it was done by Michael, on the two end stops.