15.3.12. Finishing off the preparatory work before the concrete comes tomorrow. Shuttering in place, reinforcement located and welded where needed, railing posts positioned, bollards painted, mastic pumped in where needed, end stops positioned prior to welding etc. Also preparing to fit the shuttering for the right hand track.

No comments:

Post a Comment