28.2.12. The final four holes to drill and bolt to retain the tracks and that job is done. Then on to the preparatory work of clearing ground and placing hardcore where needed on outer side of the piles on both sides. Shuttering will have to be made and secured in place prior to pouring the concrete.
Unfortunately problems sometimes arise. You'll have heard of diggers cutting electric cables and plunging towns into darkness. Well, our effort was to cut off the water supply, by digging up a water main with the digger. Not a major mishap and easily corrected, but entertaining for the moment. You can be sure he won't live it down.