21.3.12.
Now that the soil heap has been removed we can get the WE onto the tracks for testing, Michael did the driving. The area previously under the soil heap can be cleaned up and can be used for it's proper job of hardstanding. Quietly, on the road side of the slip, Lawrence was cutting and fitting a steel drainage channel in the concrete ourside the pumpout shed to take rain water directly into the slip. Actually, not very quietly!









No comments:

Post a Comment