27.1.12. Concrete day, attended by several of the regular concrete team, Colin, Pirate Brian, Ernie, Bill, Ashley and the daily regulars of course, Steve, Dave and DM Brian, and joined for the first time by W John. Alan was sunning himself on a beach further south.
The first of three loads came in at 9am in reasonable though cold weather, and the team led by Colin got to work in progressingly more difficult conditions. Finally ending in a downpour that required the concrete to be sheeted, as you can see from the photographs.

















Can't have any concrete in our lovely drain