28.11.11. An important part of the whole is the reconstruction of the jetty to the south of the slip. It entails the purchase of some used piles, and positioning them to reform the jetty. It required cutting one down the middle and folding it to a tighter bend. In all 10 piles were positioned and hammered into place while pulling them to form the right curve to meet the old jetty at the right place.