17th of August. The re-enforcement for the concrete is positioned and welded into the first and third bays. Tomorrow we seal the bays so the concrete can't escape as it's poured, on Friday the 19th, 18 cubic metres of it in three loads. The steel angle seen in these photos will be welded to the frames and will form the guides for the wheels of the boat trailer.



No comments:

Post a Comment